Preparing the secondary mirror for installation
The Rubin summit team works to prepare the secondary mirror's support structure.
Credit:Rubin Obs/NSF/AURA/W. O'Mullane
About the Image
Id: | noirlab2419b |
Type: | Photographic |
Release date: | Aug. 1, 2024, 1 p.m. |
Related releases: | noirlab2419 |
Size: | 4259 x 2603 px |
About the Object
Category: | Vera C. Rubin Observatory |
Image Formats
Large JPEG
3.9 MB
Publication TIFF 4K
19.0 MB
Publication JPEG
3.5 MB
Screensize JPEG
402.5 KB