¡Lo sentimos! Esta página aún no está disponible en su idioma preferido, por lo que estamos mostrando la versión original.
LSST Dome - Testing the Azimuth Drives
October 17, 2019 A team from EIE and Phase Motion Control has arrived on the summit to start up and test the LSST Dome azimuth drives. As of last week, the bogies had undergone final alignment, installation/connection of drives was complete and the dome was successfully rotating under power with a provisional friction drive system in lieu of the final rack-and-piñon system.
Créditos:LSST Project/NSF/AURA
Sobre el Video
Id: | rubin-rubin-dome-testing-the-azimuth-drives |
Release date: | 25 de Octubre de 2019 |
Duración: | 17 s |
Cuadros por segundo: | 30 fps |
Sobre el Objeto
Categoría: | Vera C. Rubin Observatory |