AURA Recinto Before and After
The AURA Recinto pedestrian crossing before (left) and after (right) the 2024 construction project.
Credit:NOIRLab
About the Image
Id: | Before-After-CC |
Type: | Photographic |
Release date: | Dec. 20, 2024, 10:47 a.m. |
Size: | 2660 x 960 px |
About the Object
Name: | AURA Base Facility, La Serena, Chile, Chile, La Serena, Chile |
Category: | Chile |