¡Lo sentimos! Esta página aún no está disponible en su idioma preferido, por lo que estamos mostrando la versión original.
Summit Facility Second Floor Landing
Arrive at the second floor by stairs or elevator and you peer through glass doors to the office and control area of the building. Materials for painters are touching up the details are seen in the office area and final clean up is taking place in the bathroom area to the right.
Créditos:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-20180220-124653-001 |
Tipo: | Photographic |
Release date: | 21 de Febrero de 2018 |
Size: | 3264 x 1836 px |
Sobre el Objeto
Nombre: | Cerro Pachón |
Categoría: | Buildings Vera C. Rubin Observatory |