Summit Facility Second Floor Landing

Arrive at the second floor by stairs or elevator and you peer through glass doors to the office and control area of the building. Materials for painters are touching up the details are seen in the office area and final clean up is taking place in the bathroom area to the right.

Créditos:

Rubin Observatory/NSF/AURA

About the Image

Id:rubin-20180220-124653-001
Tipo:Photographic
Release date:21 de Febrero de 2018
Size:3264 x 1836 px

Sobre el Objeto


Formatos de Imágenes

Large JPEGLarge JPEG
812,1 KB
Screensize JPEGScreensize JPEG
102,7 KB

Zoomable


Fondos de Pantalla

1024x7681024x768
141,1 KB
1280x10241280x1024
213,8 KB
1600x12001600x1200
294,7 KB
1920x12001920x1200
341,2 KB
2048x15362048x1536
1,8 MB