Rubin Calibration Screen Installation
The summit team completed Installation of Rubin's in-dome calibration screen in January 2025. Each panel was carefully lifted into place using special winches and soft cloth slings.
Credit:RubinObs/NOIRLab/SLAC/DOE/NSF/AURA/H. Herrera
About the Image
Id: | rubin-CalibrationScreenInstall1-CC |
Type: | Photographic |
Release date: | March 6, 2025, 10:02 a.m. |
Size: | 3280 x 1476 px |
About the Object
Category: | Vera C. Rubin Observatory |