M2 Arrival at Summit Facility
Upon arrival at the LSST summit facility, the shipping container for the Secondary Mirror (M2) was opened and a visual inspection of the mirror was made. No damage was seen and very little dust accumulated during the voyage.
Credit:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-m2-in-facility-2 |
Type: | Photographic |
Release date: | Dec. 20, 2018 |
Size: | 832 x 713 px |
About the Object
Name: | Cerro Pachón |
Category: | Vera C. Rubin Observatory |