¡Lo sentimos! Esta página aún no está disponible en su idioma preferido, por lo que estamos mostrando la versión original.
M2 Arrival at Summit Facility
Upon arrival at the LSST summit facility, the shipping container for the Secondary Mirror (M2) was opened and a visual inspection of the mirror was made. No damage was seen and very little dust accumulated during the voyage.
Créditos:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-m2-in-facility-2 |
Tipo: | Photographic |
Release date: | 20 de Diciembre de 2018 |
Size: | 832 x 713 px |
Sobre el Objeto
Nombre: | Cerro Pachón |
Categoría: | Vera C. Rubin Observatory |