ETU1

In IR2, technicians prepare to uncouple ETU1 from the bell jar baseplate. During this operation, the ESD shroud will be removed from ETU1, and the transport cart readied to move ETU1 to a test bench for a basic set of functional tests, called aliveness testing. The purpose of aliveness testing is to verify the RTM arrived with the same level of functionality that was recorded prior to shipping.

Credit:
SLAC/Rubin Observatory/NSF/AURA

About the Image

Id:rubin-stu1
Type:Photographic
Release date:June 7, 2017
Size:441 x 549 px

About the Object


Image Formats

Large JPEGLarge JPEG
121.5 KB
Screensize JPEGScreensize JPEG
295.9 KB

Zoomable


Wallpapers

1024x7681024x768
221.5 KB
1280x10241280x1024
300.5 KB
1600x12001600x1200
371.3 KB
1920x12001920x1200
394.7 KB
2048x15362048x1536
1.7 MB