All Around LSST

LSST Assembly Integration Verification (AIV) Manager Jacques Sebag submitted this spectacular drone footage of the LSST facility, taken on December 28. The aerial video was taken after the LSST team collaborated with subcontractor Besalco to move the facility mobile roof to the flat area located on the north side of the lower enclosure. Congratulations to all for this achievement at the end of 2017!

Créditos:

LSST Project/NSF/AURA

Sobre el Video

Id:rubin-around-rubin
Release date:5 de Enero de 2018
Duración:03 m 04 s
Cuadros por segundo:30 fps

Sobre el Objeto


Ultra HD (info)


HD


Para Radiodifusores