¡Lo sentimos! Esta página aún no está disponible en su idioma preferido, por lo que estamos mostrando la versión original.
Installation of the Center Section on the TMA
Full-scale integration of the elevation structure onto the azimuth assembly is in progress; this video shows the central section of the elevation structure being mounted on top of the elevation trunnions. Current and near-term scheduled work on the Telescope Mount Assembly (TMA) includes verification of component fit and function, continued installation of the top end of the telescope, and installation of the electrical and fluid systems. This work is all ramping up to support factory testing near the end of the year.
Créditos:LSST Project/NSF/AURA
Sobre el Video
Id: | rubin-center-section-install |
Release date: | 5 de Octubre de 2017 |
Duración: | 28 s |
Cuadros por segundo: | 30 fps |
Sobre el Objeto
Nombre: | Asturfeito, S.A., Spain |
Categoría: | Vera C. Rubin Observatory |
Para Radiodifusores
Full HD Broadcast 1080p
488,8 MB checksum